Information for the media on our activities, together with contact information.

www.mediacentre.gold.org

Hello, you either have JavaScript turned off or an old version of Adobe's Flash Player. Get the latest Flash player.

Gold

Explorer issues update on Brazil gold drilling > Gold News > World Gold Council, gold information and resources for the media

 

Explorer issues update on Brazil gold drilling

The news feeds on this site are independently provided by Adfero Limited © and do not represent the views or opinions of the World Gold Council.

Tuesday, 20th May 2008 (1309 views)

Linear Gold has completed five of its planned six-hole drilling programme at the El Filao high-grade gold vein system in the state of Mato Grosso, northern Brazil, the company has said.

The 1,600-metre campaign is designed to build on a six-hole drilling programme completed by a local operator in the 1990s.

Results from this work included gold values ranging from 9.6 g/t gold to 104 g/t gold over widths varying from 0.7 metres to 1.7 metres, Linear said.

Subsequent trenching samples taken from El Filao along strike from this drilling included grades of 11.8 g/t gold over a width of 80 metres.

Linear added that it is also planning further drilling at the site - with eight holes set to test a 900-metre length of the main vein at a depth of 60 metres.

Another three holes will be completed to test a newly-discovered parallel vein structure, while additional drilling will test for mineralisation down dip.

The El Filao project covers a total of 10,650 hectares in the Alta Floresta gold province. The vein system was discovered in 1992.

 

« Back to Gold News stories

 

Gold News Archive:

 
 
News provided by Adfero Ltd
  • Gold Spot Price
  • Bid: $1150.80
  • Ask: $1151.60
  • Last Update: 22:16 GMT
© 2009 World Gold Council - all rights reserved. Produced and managed by CFP Group.